Homeowners, contractors, and pool builders, please know that these disclaimers that are on our purchase orders are applied and agreed upon to all jobs, no matter what the situation or circumstance, through any forms of a contract either verbal or written, approved or unapproved by you:
Yardage placed can vary due to form setting, steel placement, and proper soil compaction. The yardage estimate of this purchase order is solely intended for the purpose of planning required materials, labor and equipment so that
Houston Gunite can complete the job on the day of the shoot. It is not an official representation of the actual material need or to be placed but an estimate of the service requested. You will be charged what is shot.
You should be on site to confirm your dig meets your diagram; otherwise, we can only use our best judgment. We are not responsible if your excavator over or under digs your project, thus causing the use of more material.
Pipes in the floor should be buried under rock or gravel, otherwise, cracks will result, and we are not liable.
Repairs caused by improperly installed pipes (creating expansion joints) are not covered under our warranty.
A full truckload of material results in 12 cubic yards of shot material charged per truck. Partial trucks material usage is determined by in-field observation and billed accordingly. You should be on site to sign off on trucks being used and yardage unloaded.
Travel (if applicable) is charged from our loading yard in Houston, Tx. you will be charged a travel fee based on zone map.
Pools must be pumped of water at least 24 hours prior to application of Gunite and must have begun to dry out. Pools must be free of dirt from cave-ins, mud/muck, debris, trash, if not you will be charged accordingly to have it done by Houston Gunite. Normally we do not Clean/muck out pools.
Plumbing and electricity must be properly installed, aligned and or leveled prior to appearing. Failure to do so will result in delay and or other extra charges and or pull off fees.
Gunite must be soaked by clean water for a minimum 14 days and preferably through 28 (twenty-eight) consecutive days, and highly recommended until the day before the final surface finish (i.e Pebble/ Plaster) beginning the day after Gunite application. The builder is responsible for maintaining weep holes clean throughout the construction process, and for maintaining the Gunite finish properly hydrated.
All Invoices are due upon receipt after completion of the shooting project/job.
Houston Gunite is not and will not be responsible for any fines, dues, and or damages due to the fact that the project has not been inspected by the proper inspectors (either city or private) at the start of the Gunite application.
Houston Gunite is not responsible for and is hereby released from any and all liability from damages and yardage miscalculations caused by design, engineering, and excavation miscalculation and or rebar placement.
Houston Gunite is not responsible for and is hereby released from any and all claims and liabilities for all and any damages as a result of improper clean-up of the project site before and after Gunite. This will be the sole responsibility of the pool builder.
All protection of all animals, all other equipment, all other furniture is disclaimed.
If a pull off is necessary, there will be a pull off charge and will be the responsibility of the pool builder.
Houston Gunite disclaims all liability to public or private driveways, streets, road, pathways, landscaping, sprinklers and or other property features, fences of any kind and gates of any kind when we need to situate our equipment near your project construction site and area in order to perform the job you requested.
All issues of and due to gunite placement (i.e., placement and amount of rebound outside of pool, overspray, dust, damages, etc.) must be notified to Houston Gunite within 72hrs. after gunite placement and or before the next phase of the project begins. If after the time allotted Houston Gunite cannot and will not assume any responsibility.
The disclaimers, agreements, and warranty made on the Purchase Order and here on the website are enforceable and binding with or without any signature or approval and or consent of any person or company due to you and or your company agreeing that we provide Gunite services and are enforceable immediately after we begin the gunite application process.
Hydration of Pool Shell: Gunite continues to cure even after it looks like it is dry. Someone (homeowner, pool builder, etc.) (not Houston Gunite) needs to hydrate the gunite by soaking the gunite 2x (twice) a day for a minimum 14 days and preferably through 28 days after gunite (we highly recommend hydrating your pool until the day before it is to be plastered or pebbled). This is an important part of the curing process and could affect the overall quality and strength of the gunite. Pools that do not cure properly due to improper curing due to lack of hydration and therefore do not meet certain PSI strengths and or requirements are not covered by our warranty.
Cracking: is a natural by-product of the gunite/ concrete swelling and shrinking, due to temperature/ climate conditions and amount of hydration or lack thereof a gunite pool shell gets. It is common to see hairline cracks (also known as spider cracking) on the shell of the pool. Each pool is different so each situation of cracking will be different as well (if this does even occur). Pools that are open/ stay open (meaning not having been plastered or pebbled or have not been waterproofed) for more than 60 days after the gunite is shot are not covered by our warranty.
Dusting: Dust is a natural byproduct of the gunite process. Since the material is dry (concrete sand and Type 1 portland cement) dust is produced when these two materials are mixed together by our auger system, by material dropping into the gunite gun, and at the end of the nozzle when it is being blown into the pool. Houston Gunite is not responsible for any dust damage to buildings or vehicles from the dust being moved by air, wind and other natural and non-natural methods or causes outside the surrounding area of the pool or project area as well as the unloading and mixing area. Please inform all surrounding neighbors and people that the gunite crew will be coming and to move all their vehicles/ items out of range and or indoors to help prevent any dusting to their vehicles/ items.